The problem it solves
Requirements are a classic breaking point in IT projects. They often go undocumented because “everyone knows what is needed”. They can be contradictory because each department describes the same process differently. And they change along the way, because only a working solution reveals what is really needed.
The technology usually holds up. The weak point is the path from conversation to build: agreements get lost along the way, changes go straight into the code, and the solution quietly drifts away from what was agreed. REQLOOP structures this path as loops with a measurable end, so that gaps and contradictions surface at the requirements stage, well before production.
Where it is used
REQLOOP is used in the AI readiness audit and in pilot preparation. Together with Automatic Workshop Analyser, it carries a project from process discovery, through requirements, to a working solution.
The division of work is simple: the system extracts the requirements, checks them and builds, while a person approves everything that calls for a decision. The client receives the results of this work — approved requirements, an agreed definition of done and a working solution — while the tool itself stays with us.
What it means for the organisation
The organisation receives requirements it can read, verify and approve before paying for the build — and a definition of done it signs off before the build begins.
A solution built on this foundation is also easier to maintain and develop. Every part of it can be traced to the requirement it comes from, so every later change has a clear reference point.